22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Azuqueca de Henares, Guadalajara

C/ Azuqueca De Henares, 2, Cabanillas del Campo (19171), Guadalajara, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates40.63591, -3.22504
Official IDT3KV6BQ2X0DC3LIVYS3E
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cabanillas del Campo, belonging to the province of Guadalajara (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeT3KV6BQ2X0DC3LIVYS3E
Post / EVSE Identifier #10DKXF8M9Q5WUBTWJZQ9VTXPMIXM
Post / EVSE Identifier #2ES*REP*E16324*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4L9X9PWGPFLXOFPR8GAVTBUPAQXW
Post / EVSE Identifier #5ES*REP*E16324*2
Post / EVSE Identifier #62
Post / EVSE Identifier #75EEY9QGASH8LNEA09DBUTRK4CAT
Post / EVSE Identifier #8ES*REP*E16382*1
Post / EVSE Identifier #9UV6GETL1GIK6FMJ6OTPUMLURBNZ
Post / EVSE Identifier #10ES*REP*E16382*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.635912 | Lon: -3.225041View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
3.2 km away

AhorraMas Aritio

C. De Francisco Aritio 105
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.