EV Charging Stations in Cabanillas del Campo (Guadalajara)
As of 24/10/2026, the municipality of Cabanillas del Campo (Guadalajara) has a total of 3 active public charging stations, with 7 dedicated charging bays and 10 connectors in service. Maximum power output reaches 50 kW, with 6 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Cabanillas del Campo
Official consolidated metrics from the public MITECO registry
- Stations
- 3 Physical locations
- Charging Points
- 7 Dedicated bays
- Active Plugs
- 10 Operational outlets
- Fast Charging
- 6 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 50 kW Peak recorded
Available Connectors in Cabanillas del Campo
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 3 plugs |
| CHAdeMO | 2 plugs |
| Tipo 2 (Mennekes) | 5 plugs |
Power Distribution in Cabanillas del Campo
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 6 plugs |
| Semi-fast (7.4 to 22 kW) | 4 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Cabanillas del Campo
3 stations mappedInteractive EV Charging Map
3 charging stations ready to explore
All EV Charging Locations in Cabanillas del Campo
Verified specs, connector types and speeds from the official ministry registry
Mercadona, Azuqueca de Henares, Guadalajara
Repsol ES, Reim Oil S.L.
Frequently Asked Questions in Cabanillas del Campo
How many public EV charging points are there in Cabanillas del Campo?
Cabanillas del Campo currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 10 operational charging plugs.
Are fast charging stations available in Cabanillas del Campo?
Yes, Cabanillas del Campo features 6 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Cabanillas del Campo?
Public charging infrastructure in Cabanillas del Campo is mainly operated by REPSOL SOLUCIONES ENERGÉTICAS SA, IBERDROLA CLIENTES S.A.U, among other regional networks.
Closest Neighboring Towns to Cabanillas del Campo with EV Chargers
Physical proximity calculated via GPS Haversine distance from Cabanillas del Campo
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.