50 kW• Fast24/7Active in MITECO registry

GU-CabanillasdelCampo-001

Comercio,2, Cabanillas del Campo (19171), Guadalajara, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (3 plugs)
GPS Coordinates40.63089, -3.23730
Official ID2024000960
Official Registry DateJan 19, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cabanillas del Campo, belonging to the province of Guadalajara (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000960
Post / EVSE Identifier #1COD20240000019795PR00002831
Post / EVSE Identifier #2ES*IBD*E155900
Post / EVSE Identifier #3165373
Post / EVSE Identifier #4COD20240000019796PR00002832
Post / EVSE Identifier #5ES*IBD*E155901
Post / EVSE Identifier #6165375
Post / EVSE Identifier #7165374

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.630893 | Lon: -3.237297View on OpenStreetMap →

Other Nearby Charging Stations

360 kW(Ultra-fast)
4.1 km away

Alovera

Con A-2, Gu-105, Pk 48, 000, 19208 Alovera, G
Operator:(ZUNDER) Grupo Easychargar SA
CCS Combo 2
4 points • 4 plugs
Details
22 kW(Semi-fast)
4.3 km away

AhorraMas Aritio

C. De Francisco Aritio 105
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.