150 kW• Ultra-fast🏨Hotel / AlojamientoActive in MITECO registry

TotalEnergies - Hotel Mirasierra

Hotel Mirasierra A-1, Salida 99, Casla (40590), Segovia, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates41.18810, -3.58362
Official ID0ABYOR885E4US6RFRJFV
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Casla, belonging to the province of Segovia (Castilla y León, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
2Charging Bay #2
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
3Charging Bay #3
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
4Charging Bay #4
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code0ABYOR885E4US6RFRJFV
Post / EVSE Identifier #1NNCHYFZQWHXEV1NCLEXKRO676XR
Post / EVSE Identifier #2ES*TCB*E001243
Post / EVSE Identifier #31
Post / EVSE Identifier #4HDCGI9SMRVO2WTQCAWOVNPVK4BK
Post / EVSE Identifier #5ES*TCB*E001244
Post / EVSE Identifier #6OQXL4Z6R7WVZDYF9CVDTDSNM7I0
Post / EVSE Identifier #7ES*TCB*E001246
Post / EVSE Identifier #8WPPO9W17VVITPG4HQ6BDNRHDAC0
Post / EVSE Identifier #9ES*TCB*E001245

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.1881 | Lon: -3.583617View on OpenStreetMap →

Other Nearby Charging Stations

25 kW(Semi-fast)⛽Estación Repsol
7.9 km away

Repsol ES, NAVAS. S.L.

Cr A-1, 107,4
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.