TotalEnergies - Castillejo de Mesleon

Av. Aragon, 9, Castillejo de Mesleón (40593), Segovia, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates41.28003, -3.60074
Official IDZERLSNALKLHKNENXTLWJ
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Castillejo de Mesleón, belonging to the province of Segovia (Castilla y León, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:200 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:200 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeZERLSNALKLHKNENXTLWJ
Post / EVSE Identifier #1WPX7ACVOXQDPPRU6IIF6VI7UVCB
Post / EVSE Identifier #2ES*TCB*E000946
Post / EVSE Identifier #31
Post / EVSE Identifier #4ZAUGQFGFJYPM7WTANTKTU6ZSWE0
Post / EVSE Identifier #5ES*TCB*E000947
Post / EVSE Identifier #60FHPVQSSTEPFD94XG6ZW2UJN5KA
Post / EVSE Identifier #7ES*TCB*E000948
Post / EVSE Identifier #8DLFRGJCVBXJ09OZY3OIIU6VQXJI
Post / EVSE Identifier #9ES*TCB*E000949

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.28003 | Lon: -3.600741View on OpenStreetMap →

Other Nearby Charging Stations

25 kW(Semi-fast)⛽Estación Repsol
2.4 km away

Repsol ES, NAVAS. S.L.

Cr A-1, 107,4
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
50 kW(Fast)
6.5 km away

61943050290010

Plaza San Antonio, 7
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
150 kW(Ultra-fast)🏨Hotel / Alojamiento
10.3 km away

TotalEnergies - Hotel Mirasierra

Hotel Mirasierra A-1, Salida 99
Operator:TotalEnergies Charging Services España, SLU
CCS Combo 2
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.