100 kW• Fast🏨Hotel / AlojamientoActive in MITECO registry

TotalEnergies - Hotel Caballo Negro

C. Comercio, 1, Puerto Real (11510), Cádiz, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates36.54003, -6.17324
Official IDJDVGPMO6G8CYQJSEUUAE
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Puerto Real, belonging to the province of Cádiz (Andalucía, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeJDVGPMO6G8CYQJSEUUAE
Post / EVSE Identifier #1RTGMAG62EPPJVNHCOZH2JZRY9JD
Post / EVSE Identifier #2ES*TCB*E000820
Post / EVSE Identifier #31
Post / EVSE Identifier #4PZLPGY2V96Z4EMT8YFGSAQJMDJ4
Post / EVSE Identifier #5ES*TCB*E000819
Post / EVSE Identifier #6HVXGRNRYJRNVP8P7P93MGTH6YI6
Post / EVSE Identifier #7ES*TCB*E000818
Post / EVSE Identifier #825FWOBKPANCJIP8HVGAUJXU2DE7
Post / EVSE Identifier #9ES*TCB*E000817

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 36.54003 | Lon: -6.173236View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
11.6 km away

CA-Cadiz-007

Dr Gómez Ulla,13
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.