24 kW• Semi-fast🅿️Parking24/7Active in MITECO registry

ACCIONA - Parking Puerta del Mar

Avenida Ana De Viya, 54D, Cádiz (11009), Cádiz, Spain
Network OperatorACCIONA Recarga
Total Capacity1 bay (2 plugs)
GPS Coordinates36.50873, -6.27847
Official ID2024004403
Official Registry DateJun 21, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cádiz, belonging to the province of Cádiz (Andalucía, Spain). The charging equipment and commercial operation belong to the ACCIONA Recarga network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
24 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
CHAdeMO
24 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004403
Post / EVSE Identifier #1COD20240000036415PR00011550
Post / EVSE Identifier #2ES*ARE*ECFGKHVFGXVSVUV3K
Post / EVSE Identifier #35b9247e28636fa39f4adb810
Post / EVSE Identifier #45b9247e28636fa39f4adb80e

Theoretical Charging Times at Maximum Power (24 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~50 min(~0.8 hours)
40 kWh Battery~1 h 40 min(~1.7 hours)
60 kWh Battery~2 h 30 min(~2.5 hours)
80 kWh Battery~3 h 20 min(~3.3 hours)

Opening Hours

Domingo (00:00 - 23:59) Martes (00:00 - 23:59) Miercoles (00:00 - 23:59) Viernes (00:00 - 23:59) Lunes (00:00 - 23:59) Sabado (00:00 - 23:59) Jueves (00:00 - 23:59)

Supported Payment Methods

✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 36.5087322 | Lon: -6.2784666View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
3.8 km away

CA-Cadiz-007

Dr Gómez Ulla,13
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7 kW(Standard)
15.0 km away

CA-Chiclana-005

Concepcion,12
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.