150 kW• Ultra-fastActive in MITECO registry

TotalEnergies - E.S. Petrocar Montijo

Avenida De La Puebla, 6, Montijo (06480), Badajoz, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates38.89938, -6.62146
Official IDOAXN8VAAO97PCUDRMJAN
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Montijo, belonging to the province of Badajoz (Extremadura, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeOAXN8VAAO97PCUDRMJAN
Post / EVSE Identifier #1IBEIG3NVZ2OBDALJRQ0C4NRNEBR
Post / EVSE Identifier #2ES*TCB*E000698
Post / EVSE Identifier #31
Post / EVSE Identifier #4YSBLIQO5DFSX901WIMIMYIRE2IR
Post / EVSE Identifier #5ES*TCB*E000699
Post / EVSE Identifier #6FPAGPFZLJGAUZGQSBWSX92URCVN
Post / EVSE Identifier #7ES*TCB*E000700
Post / EVSE Identifier #8TR4TYZRXYYDCZJZC7ADV1ESPFCX
Post / EVSE Identifier #9ES*TCB*E000701

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.89938 | Lon: -6.621464View on OpenStreetMap →

Other Nearby Charging Stations

150 kW(Ultra-fast)
0 m away

E.S. Petrocar Montijo

Ctra. De La Puebla, 4
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
50 kW(Fast)⛽Estación Repsol
390 m away

Repsol ES, Gesmaran S.L

Cl Avenida Colon, S.N
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.