TotalEnergies - Camping Queixans

Carrer Del Cadi, 21, Alp (17538), Girona, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity3 bays (3 plugs)
GPS Coordinates42.39256, 1.91584
Official IDM5AGIUXIAGVATYFIUMUX
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alp, belonging to the province of Girona (Cataluña, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:100 A
3Charging Bay #3
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:100 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeM5AGIUXIAGVATYFIUMUX
Post / EVSE Identifier #1EHUZ2DTX01F2O4NAQFCX7CGRPBS
Post / EVSE Identifier #2ES*TCB*E001124
Post / EVSE Identifier #31
Post / EVSE Identifier #4ORGOFKICBGVHF4UNWBIVZY24M1Q
Post / EVSE Identifier #5ES*TCB*E001123
Post / EVSE Identifier #6GRAHFRY1EQWEBGCMGOPKN1DWCY8
Post / EVSE Identifier #7ES*TCB*E001122

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.392563 | Lon: 1.915839View on OpenStreetMap →

Other Nearby Charging Stations

120 kW(Fast)
3.4 km away

ACCIONA - Alp

Carrer Mancomunitat, 4
Operator:ACCIONA Recarga
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.