120 kW• Fast24/7Active in MITECO registry

Rest. El Sequero

Ctra. Logroño-Zaragoza (Nacional 232), Agoncillo (26160), Rioja, La, Spain
Network OperatorWENEA EMOBILITY SERVICES S.L.
Total Capacity4 bays (4 plugs)
GPS Coordinates42.43187, -2.28112
Official ID2024004098
Official Registry DateJun 12, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Agoncillo, belonging to the province of Rioja, La (Rioja, La, Spain). The charging equipment and commercial operation belong to the WENEA EMOBILITY SERVICES S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:300 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
CCS Combo 2
120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:300 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004098
Post / EVSE Identifier #1COD20240000034093PR00010285
Post / EVSE Identifier #2ES*WEN*ESEQUERO14
Post / EVSE Identifier #3621bbab3-5073-0638-fce4-18960c7caa49
Post / EVSE Identifier #4COD20240000034094PR00010286
Post / EVSE Identifier #5ES*WEN*ESEQUERO13
Post / EVSE Identifier #6e733fd0d-c910-0089-57ac-cf8c478b2891
Post / EVSE Identifier #7COD20240000034095PR00010287
Post / EVSE Identifier #8ES*WEN*ESEQUERO12
Post / EVSE Identifier #9997a61a5-f6fd-2dc4-4808-f162bdd75a2b
Post / EVSE Identifier #10COD20240000034096PR00010288
Post / EVSE Identifier #11ES*WEN*ESEQUERO11
Post / EVSE Identifier #1292fe4965-966b-7d7c-a040-21f9b04c1a45

Theoretical Charging Times at Maximum Power (120 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~10 min(~0.2 hours)
40 kWh Battery~20 min(~0.3 hours)
60 kWh Battery~30 min(~0.5 hours)
80 kWh Battery~40 min(~0.7 hours)

Opening Hours

Viernes (00:00 - 23:59) Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Lunes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.43187 | Lon: -2.281125View on OpenStreetMap →

Other Nearby Charging Stations

350 kW(Ultra-fast)
7.5 km away

IONITY Logroño Norte

Ap-68, Km 136, Área De Servicio De Logroño
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
2 points • 2 plugs
Details
350 kW(Ultra-fast)
7.6 km away

IONITY Logroño Sur

Ap-68, Km 136, Área De Servicio De Logroño
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
2 points • 2 plugs
Details
100 kW(Fast)🏨Hotel / Alojamiento
10.7 km away

Hostal Mesón Pepa

Av. Aragón, 9
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.