100 kW• Fast🏨Hotel / Alojamiento24/7Active in MITECO registry

Hostal Mesón Pepa

Av. Aragón, 9, Logroño (26006), Rioja, La, Spain
Network OperatorWENEA EMOBILITY SERVICES S.L.
Total Capacity4 bays (4 plugs)
GPS Coordinates42.46041, -2.40586
Official ID2024004043
Official Registry DateJun 12, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Logroño, belonging to the province of Rioja, La (Rioja, La, Spain). The charging equipment and commercial operation belong to the WENEA EMOBILITY SERVICES S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004043
Post / EVSE Identifier #1COD20240000033816PR00010008
Post / EVSE Identifier #2ES*WEN*EMESONPEPA14
Post / EVSE Identifier #382866683-2cc5-97d5-7882-bfa0b0f22105
Post / EVSE Identifier #4COD20240000033817PR00010009
Post / EVSE Identifier #5ES*WEN*EMESONPEPA13
Post / EVSE Identifier #647dcf319-a255-50f2-9fdc-7e35dc239497
Post / EVSE Identifier #7COD20240000033818PR00010010
Post / EVSE Identifier #8ES*WEN*EMESONPEPA11
Post / EVSE Identifier #9b6091d07-c1f0-8a52-df1e-c0163c4d79f6
Post / EVSE Identifier #10COD20240000033819PR00010011
Post / EVSE Identifier #11ES*WEN*EMESONPEPA12
Post / EVSE Identifier #1240462754-5240-9fa5-1814-29640e6acaa4

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59) Sabado (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.460406 | Lon: -2.405856View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)🏬Centro Comercial
1.2 km away

ACCIONA - C.C. Berceo

Calle Lérida, 1
Operator:ACCIONA Recarga
CCS Combo 2Tipo 2 (Mennekes)
17 points • 17 plugs
Details
14 kW(Semi-fast)
2.3 km away

LO-Logroño-013

Duquesa De La Victoria,74
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
350 kW(Ultra-fast)
3.2 km away

IONITY Logroño Sur

Ap-68, Km 136, Área De Servicio De Logroño
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.