7.36 kW• Standard⛽Estación Repsol24/7Active in MITECO registry

Repsol, Valle de Mena, Vía pública

C/ Félix Rodríguez De La Fuente, 2L, Valle de Mena (09580), Burgos, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity2 bays (2 plugs)
GPS Coordinates43.09823, -3.28338
Official IDD1VGUPBRGRDWJ2XLEM2K
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Valle de Mena, belonging to the province of Burgos (Castilla y León, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeD1VGUPBRGRDWJ2XLEM2K
Post / EVSE Identifier #1VWF9ZEWDGM3F3ME7O7VZN0IAAWM
Post / EVSE Identifier #2ES*REP*E17426*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4LXKPMHPPVFJRNC4I22WX858SIN0
Post / EVSE Identifier #5ES*REP*E17426*2
Post / EVSE Identifier #62

Theoretical Charging Times at Maximum Power (7.36 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 43 min(~2.7 hours)
40 kWh Battery~5 h 26 min(~5.4 hours)
60 kWh Battery~8 h 9 min(~8.2 hours)
80 kWh Battery~10 h 52 min(~10.9 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.098232 | Lon: -3.283376View on OpenStreetMap →

Other Nearby Charging Stations

7.3 kW(Standard)
470 m away

BU-ValledeMena-001

Las Lamparas,10
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
180 kW(Ultra-fast)
16.4 km away

Aduriz Polígono la Sierra

Polígono La Sierra, Parcela 11
Operator:ADURIZ ENERGIA SLU
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
3 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.