180 kW• Ultra-fast24/7Active in MITECO registry

Aduriz Polígono la Sierra

Polígono La Sierra, Parcela 11, Espinosa de los Monteros (09569), Burgos, Spain
Network OperatorADURIZ ENERGIA SLU
Total Capacity3 bays (5 plugs)
GPS Coordinates43.05754, -3.47752
Official IDMND88ACA12WHZTMQAGH9
Official Registry DateSep 11, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Espinosa de los Monteros, belonging to the province of Burgos (Castilla y León, Spain). The charging equipment and commercial operation belong to the ADURIZ ENERGIA SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CCS Combo 2
180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
3 connectors available
Tipo 2 (Mennekes)
43.65 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeMND88ACA12WHZTMQAGH9
Post / EVSE Identifier #1SXJ7AFGEXHVY8FHF3SOHHIUHHUJ
Post / EVSE Identifier #2ES*ADU*E15890*1
Post / EVSE Identifier #31
Post / EVSE Identifier #48AE8VMZI5JHKR72FEXCZLKF55JV
Post / EVSE Identifier #5ES*ADU*E15890*2
Post / EVSE Identifier #62
Post / EVSE Identifier #78KRN5BVZZ2RI85JLEQZ9IZVDYO5
Post / EVSE Identifier #8ES*ADU*E15891*1
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (180 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~7 min(~0.1 hours)
40 kWh Battery~13 min(~0.2 hours)
60 kWh Battery~20 min(~0.3 hours)
80 kWh Battery~27 min(~0.4 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.057542 | Lon: -3.477518View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.