30 kW• Semi-fast24/7Active in MITECO registry

ACCIONA - Estación Medina de Pomar

Calle Doctor Fleming, 6A, Medina de Pomar (09500), Burgos, Spain
Network OperatorACCIONA Recarga
Total Capacity2 bays (3 plugs)
GPS Coordinates42.93382, -3.48744
Official ID2024004440
Official Registry DateJun 21, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Medina de Pomar, belonging to the province of Burgos (Castilla y León, Spain). The charging equipment and commercial operation belong to the ACCIONA Recarga network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
30 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
CHAdeMO
30 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:380 V
Amperage:16 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004440
Post / EVSE Identifier #1COD20240000036521PR00011656
Post / EVSE Identifier #2ES*ARE*ES5BN6QRNF1P33U9C
Post / EVSE Identifier #35b9247e28636fa39f4adb810
Post / EVSE Identifier #45b9247e28636fa39f4adb80e
Post / EVSE Identifier #5COD20240000036522PR00011657
Post / EVSE Identifier #6ES*ARE*EWD6DZJD86KAXGAW8
Post / EVSE Identifier #75b9247e28636fa39f4adb80d

Theoretical Charging Times at Maximum Power (30 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~40 min(~0.7 hours)
40 kWh Battery~1 h 20 min(~1.3 hours)
60 kWh Battery~2 h(~2 hours)
80 kWh Battery~2 h 40 min(~2.7 hours)

Opening Hours

Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59)

Supported Payment Methods

✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.9338159 | Lon: -3.4874407View on OpenStreetMap →

Other Nearby Charging Stations

180 kW(Ultra-fast)
560 m away

Aduriz Av. Burgos

Avd. De Burgos, 28
Operator:ADURIZ ENERGIA SLU
CCS Combo 2
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.