22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Avda. del Textil, Valencia

Av. Del Textil 21, Ontinyent (46870), Valencia/València, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity6 bays (6 plugs)
GPS Coordinates38.82668, -0.59215
Official ID5SEJMIDFDSINP7OQGR1I
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ontinyent, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code5SEJMIDFDSINP7OQGR1I
Post / EVSE Identifier #1DSPQ3GQ3FXU1L0VAWRYGCRIOFHZ
Post / EVSE Identifier #2ES*REP*E14046*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4K4NBP1YEYGQIWLQ0HDEJ2KOHPQI
Post / EVSE Identifier #5ES*REP*E14046*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7LOEC1HCKWDHGZESBO7CEJV77LC0
Post / EVSE Identifier #8ES*REP*E14047*1
Post / EVSE Identifier #9HIKWB9POU8RRLQIL4DACCLJLBNL
Post / EVSE Identifier #10ES*REP*E14047*2
Post / EVSE Identifier #11ZWSUMGNXKZWJ8EH5PSRYVXY2HML
Post / EVSE Identifier #12ES*REP*E14048*1
Post / EVSE Identifier #13JHRLYR9EN422CWRZMTU45BM9QAE
Post / EVSE Identifier #14ES*REP*E14048*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.826679 | Lon: -0.592146View on OpenStreetMap →

Other Nearby Charging Stations

30 kW(Semi-fast)🏬Centro Comercial
960 m away

C.C. El Teler

Carrer Del Pintor Josep Segrelles, 1
Operator:ERANOVUM E-MOBILITY, S.L.
Tipo 2 (Mennekes)CCS Combo 2
3 points • 3 plugs
Details
3.7 kW(Standard)
1.5 km away

INEL, SL

Avenida del Textil,67
Operator:FENIE ENERGIA, SA
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
1 point • 2 plugs
Details
22 kW(Semi-fast)🅿️Parking
10.6 km away

PARKING PISCINA MUNICIPAL CARRICOLA

CAMI DEL FONDO S/N (FRENTE PISCINA MUNICIPAL) Carricola, Valencia
Operator:FENIE ENERGIA, SA
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
1 point • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.