30 kW• Semi-fast🏬Centro Comercial24/7Active in MITECO registry

C.C. El Teler

Carrer Del Pintor Josep Segrelles, 1, Ontinyent (46870), Valencia/València, Spain
Network OperatorERANOVUM E-MOBILITY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates38.82447, -0.60288
Official ID2023002767
Official Registry DateSep 18, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ontinyent, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the ERANOVUM E-MOBILITY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:400 A
3Charging Bay #3
1 connector available
CCS Combo 2
30 kW
Current type:Direct Current (DC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:80 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002767
Post / EVSE Identifier #1COD20230000012207PR00001610
Post / EVSE Identifier #2ES*ERA*E25011
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000012208PR00001611
Post / EVSE Identifier #5ES*ERA*E25012
Post / EVSE Identifier #6COD20230000012209PR00001612
Post / EVSE Identifier #7ES*ERA*E25013

Theoretical Charging Times at Maximum Power (30 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~40 min(~0.7 hours)
40 kWh Battery~1 h 20 min(~1.3 hours)
60 kWh Battery~2 h(~2 hours)
80 kWh Battery~2 h 40 min(~2.7 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.8244707 | Lon: -0.6028774View on OpenStreetMap →

Other Nearby Charging Stations

3.7 kW(Standard)
2.5 km away

INEL, SL

Avenida del Textil,67
Operator:FENIE ENERGIA, SA
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
1 point • 2 plugs
Details
100 kW(Fast)
11.2 km away

V-VALLADA-001

Jose Ribera,21
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)🅿️Parking
11.6 km away

PARKING PISCINA MUNICIPAL CARRICOLA

CAMI DEL FONDO S/N (FRENTE PISCINA MUNICIPAL) Carricola, Valencia
Operator:FENIE ENERGIA, SA
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
1 point • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.