60 kW• Fast24/7Active in MITECO registry

M-BoadillaDelMonte-031

Gutierrez Soto (De),8, Boadilla del Monte (28660), Madrid, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (2 plugs)
GPS Coordinates40.40237, -3.89456
Official IDFXP2LBZCFNUG0BF5ZJK9
Official Registry DateMar 27, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Boadilla del Monte, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:150 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:150 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeFXP2LBZCFNUG0BF5ZJK9
Post / EVSE Identifier #1MMOLFKZT7HQQY9YC1BOBPXHOH6C
Post / EVSE Identifier #2ES*IBD*E396594
Post / EVSE Identifier #3309804
Post / EVSE Identifier #4FXT4GKQV1G4RYTO31TCA7Z9EGEY
Post / EVSE Identifier #5ES*IBD*E396595
Post / EVSE Identifier #6309805

Theoretical Charging Times at Maximum Power (60 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~20 min(~0.3 hours)
40 kWh Battery~40 min(~0.7 hours)
60 kWh Battery~1 h(~1 hours)
80 kWh Battery~1 h 20 min(~1.3 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE DÉBITO
💳RFID Card / Keyfob reader
📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)
✓PAGO CON TARJETA DE CRÉDITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.40237 | Lon: -3.89456View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
5.8 km away

M-VillaviciosadeOdon-001

Quitapesares,71
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.