EV Charging Stations in Boadilla del Monte (Madrid)

How many EV charging points are there in Boadilla del Monte?

As of 24/10/2026, the municipality of Boadilla del Monte (Madrid) has a total of 23 active public charging stations, with 59 dedicated charging bays and 67 connectors in service. Maximum power output reaches 350 kW, with 17 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Boadilla del Monte

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
23
Physical locations
Charging Points
59
Dedicated bays
Active Plugs
67
Operational outlets
Fast Charging
13
≥ 43 kW
Ultra-Fast
4
≥ 150 kW
Max Power
350 kW
Peak recorded

Available Connectors in Boadilla del Monte

Charging connectors by type in Boadilla del Monte
Connector TypeActive Plugs
CCS Combo 215 plugs
Tipo 2 (Mennekes)45 plugs
Schuko (Enchufe doméstico)4 plugs
CHAdeMO3 plugs

Power Distribution in Boadilla del Monte

Charging plugs distribution by power in Boadilla del Monte
Power RatingPlugs
Ultra-fast (≥ 150 kW)4 plugs
Fast (43 to 149 kW)13 plugs
Semi-fast (7.4 to 22 kW)46 plugs
Standard (< 7.4 kW)4 plugs

EV Charging Stations Map in Boadilla del Monte

23 stations mapped

Interactive EV Charging Map

23 charging stations ready to explore

All EV Charging Locations in Boadilla del Monte

Verified specs, connector types and speeds from the official ministry registry

22 kW(Semi-fast)24/7

E-28-BoadillaDelMonte-005

Majadahonda (Casco Urbano),18
Operator:IBERDROLA CLIENTES S.A.U
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
2 points • 4 plugs
Details
22 kW(Semi-fast)Horario habitual

E-M-BoadillaDelMonte-010

Victimas Del Terrorismo,8
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
22 kW(Semi-fast)✓ CableHorario habitual

Coolab Coworking

Calle Impresores, 20
Operator:Wenea Services Spain, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)✓ Cable24/7

20XM32T8KK3AR00004

C. De Santillana Del Mar, 2, 28660 Boadilla
Operator:ENDESA X WAY, S.L.
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
3 points • 3 plugs
Details
22 kW(Semi-fast)Horario habitual

E-M-BoadillaDelMonte-012

Infante Don Luis (Del),20
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)✓ Cable24/7

M-BoadillaDelMonte-027

Hermanos Machado (De Los),3
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)✓ CableHorario habitual

M-BoadilladelMonte-001

Monte Amor,2
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 5 plugs
Details
60 kW(Fast)⚡ 800V✓ Cable24/7

M-BoadillaDelMonte-029

Boadilla-Majadahonda (De),18
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
22 kW(Semi-fast)Horario habitual

E-M-BoadillaDelMonte-004

Pozuelo A Brunete (M-513),40
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
60 kW(Fast)⚡ 800V✓ Cable24/7

M-BoadillaDelMonte-031

Gutierrez Soto (De),8
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details

Frequently Asked Questions in Boadilla del Monte

How many public EV charging points are there in Boadilla del Monte?

Boadilla del Monte currently has 23 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 67 operational charging plugs.

Are fast charging stations available in Boadilla del Monte?

Yes, Boadilla del Monte features 17 fast and ultra-fast charging plugs (≥43 kW up to 350 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Boadilla del Monte?

Public charging infrastructure in Boadilla del Monte is mainly operated by IBERDROLA CLIENTES S.A.U, EDP CLIENTES SAU, CHARGING TOGETHER SL, among other regional networks.

Closest Neighboring Towns to Boadilla del Monte with EV Chargers

Physical proximity calculated via GPS Haversine distance from Boadilla del Monte

All towns in Madrid
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.