60 kW• Fast24/7Active in MITECO registry

CC La Gavia

Adolfo Bioy Casares 2, Madrid (28051), Madrid, Spain
Network OperatorEDP CLIENTES SAU
Total Capacity19 bays (20 plugs)
GPS Coordinates40.36926, -3.59911
Official ID2024002024
Official Registry DateMar 22, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the EDP CLIENTES SAU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
9Charging Bay #9
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
10Charging Bay #10
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
11Charging Bay #11
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
12Charging Bay #12
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
13Charging Bay #13
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
14Charging Bay #14
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
15Charging Bay #15
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
16Charging Bay #16
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
17Charging Bay #17
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
18Charging Bay #18
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
19Charging Bay #19
2 connectors available
Tipo 2 (Mennekes)
60 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
CCS Combo 2
⚡ 800V60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024002024
Post / EVSE Identifier #1COD20240000025421PR00005072
Post / EVSE Identifier #2ES*EDP*E01076
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000025422PR00005073
Post / EVSE Identifier #5ES*EDP*E01077
Post / EVSE Identifier #6COD20240000025423PR00005074
Post / EVSE Identifier #7ES*EDP*E01078
Post / EVSE Identifier #8COD20240000025424PR00005075
Post / EVSE Identifier #9ES*EDP*E01080
Post / EVSE Identifier #10COD20240000025425PR00005076
Post / EVSE Identifier #11ES*EDP*E01079
Post / EVSE Identifier #12COD20240000025426PR00005077
Post / EVSE Identifier #13ES*EDP*E01345
Post / EVSE Identifier #14COD20240000025427PR00005078
Post / EVSE Identifier #15ES*EDP*E01346
Post / EVSE Identifier #16COD20240000025428PR00005079
Post / EVSE Identifier #17ES*EDP*E01347
Post / EVSE Identifier #18COD20240000025429PR00005080
Post / EVSE Identifier #19ES*EDP*E01348
Post / EVSE Identifier #20COD20240000025430PR00005081
Post / EVSE Identifier #21ES*EDP*E01349
Post / EVSE Identifier #22COD20240000025431PR00005082
Post / EVSE Identifier #23ES*EDP*E01350
Post / EVSE Identifier #24COD20240000025432PR00005083
Post / EVSE Identifier #25ES*EDP*E01351
Post / EVSE Identifier #26COD20240000025433PR00005084
Post / EVSE Identifier #27ES*EDP*E01352
Post / EVSE Identifier #28COD20240000025434PR00005085
Post / EVSE Identifier #29ES*EDP*E01353
Post / EVSE Identifier #30COD20240000025435PR00005086
Post / EVSE Identifier #31ES*EDP*E01354
Post / EVSE Identifier #32COD20240000025436PR00005087
Post / EVSE Identifier #33ES*EDP*E01356
Post / EVSE Identifier #34COD20240000025437PR00005088
Post / EVSE Identifier #35ES*EDP*E01357
Post / EVSE Identifier #36COD20240000025438PR00005089
Post / EVSE Identifier #37ES*EDP*E01355
Post / EVSE Identifier #38COD20240000025439PR00005090
Post / EVSE Identifier #39ES*EDP*E01358
Post / EVSE Identifier #402

Theoretical Charging Times at Maximum Power (60 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~20 min(~0.3 hours)
40 kWh Battery~40 min(~0.7 hours)
60 kWh Battery~1 h(~1 hours)
80 kWh Battery~1 h 20 min(~1.3 hours)

Opening Hours

Domingo (00:00 - 23:59) Sabado (00:00 - 23:59) Martes (00:00 - 23:59) Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Accessibility: SI. Additional amenities: CENTRO COMERCIAL

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.36926 | Lon: -3.599114View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
10.5 km away

M-MADRID-012

Valle De Tobalina,24
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.