50 kW• Fast24/7Active in MITECO registry

M-MADRID-012

Valle De Tobalina,24, Madrid (28021), Madrid, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (3 plugs)
GPS Coordinates40.33616, -3.71489
Official ID2024000622
Official Registry DateJan 19, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:63 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000622
Post / EVSE Identifier #1COD20240000019117PR00001832
Post / EVSE Identifier #2ES*IBD*E10094
Post / EVSE Identifier #310696
Post / EVSE Identifier #410695
Post / EVSE Identifier #5COD20240000019118PR00001833
Post / EVSE Identifier #6ES*IBD*E10095
Post / EVSE Identifier #710697

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59) Lunes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.336156 | Lon: -3.714887View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
3.3 km away

M-Leganes-013

Severo Ochoa,15
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
12 points • 12 plugs
Details
22 kW(Semi-fast)
3.8 km away

M-Leganes-009

Maestro,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
50 kW(Fast)
4.2 km away

M-Madrid-078

Hilario Herranz Establos,24
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.