7.59 kW• Semi-fast24/7Active in MITECO registry

Burgos - Catedral

Plaza Vega, S/N, Burgos (09002), Burgos, Spain
Network OperatorP-APP & WEB SERVICIOS DIGITALES S.L.U.
Total Capacity8 bays (8 plugs)
GPS Coordinates42.33871, -3.70226
Official IDYDCB3EAYEILXK7KPEMTZ
Official Registry DateFeb 11, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Burgos, belonging to the province of Burgos (Castilla y León, Spain). The charging equipment and commercial operation belong to the P-APP & WEB SERVICIOS DIGITALES S.L.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeYDCB3EAYEILXK7KPEMTZ
Post / EVSE Identifier #1VNK3C7CSOMFLGOSKWRXO981C0EX
Post / EVSE Identifier #2ES*IPK*E6234222
Post / EVSE Identifier #31
Post / EVSE Identifier #4HUDSCSYWNSULPFKUWKBJW52SEXH
Post / EVSE Identifier #5ES*IPK*E6234223
Post / EVSE Identifier #6ZPYNDFT04T8S1D7OALSLEZSWHKY
Post / EVSE Identifier #7ES*IPK*E6234224
Post / EVSE Identifier #8R1S6EQNIHQ6QFDTZLDEUILS1MVC
Post / EVSE Identifier #9ES*IPK*E6234225
Post / EVSE Identifier #10J0VQHLVYBVMA8HLUDQNAQSA5BOG
Post / EVSE Identifier #11ES*IPK*E6234226
Post / EVSE Identifier #12ILXQTHS9IBPYO3L05PBJPEVROZW
Post / EVSE Identifier #13ES*IPK*E6234227
Post / EVSE Identifier #14IM35A4BJDMQSHBWHMSNKA0F9CAH
Post / EVSE Identifier #15ES*IPK*E6234220
Post / EVSE Identifier #16WVJRDUBJ0QWCGZKM9OQSVDYA5AL
Post / EVSE Identifier #17ES*IPK*E6234221

Theoretical Charging Times at Maximum Power (7.59 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 38 min(~2.6 hours)
40 kWh Battery~5 h 16 min(~5.3 hours)
60 kWh Battery~7 h 54 min(~7.9 hours)
80 kWh Battery~10 h 32 min(~10.5 hours)

Opening Hours

Martes (00:00 - 00:00) Lunes (00:00 - 00:00) Viernes (00:00 - 00:00) Sabado (00:00 - 00:00) Jueves (00:00 - 00:00) Miercoles (00:00 - 00:00) Domingo (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.33871 | Lon: -3.702256View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
280 m away

Plaza Mayor

Plaza Mayor
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.