180 kW• Ultra-fast24/7Active in MITECO registry

Burgos - Calle del Carmen

C. Del Carmen 2 - 6, Burgos (09001), Burgos, Spain
Network Operator(ZUNDER) Grupo Easychargar SA
Total Capacity2 bays (2 plugs)
GPS Coordinates42.33682, -3.70533
Official ID2023004093
Official Registry DateOct 13, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Burgos, belonging to the province of Burgos (Castilla y León, Spain). The charging equipment and commercial operation belong to the (ZUNDER) Grupo Easychargar SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:300 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:300 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023004093
Post / EVSE Identifier #1COD20230000015461PR00004395
Post / EVSE Identifier #2ES*ZUN*E0906ER1
Post / EVSE Identifier #342134
Post / EVSE Identifier #4COD20230000015462PR00004396
Post / EVSE Identifier #5ES*ZUN*E0906ER2
Post / EVSE Identifier #642137

Theoretical Charging Times at Maximum Power (180 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~7 min(~0.1 hours)
40 kWh Battery~13 min(~0.2 hours)
60 kWh Battery~20 min(~0.3 hours)
80 kWh Battery~27 min(~0.4 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.3368162 | Lon: -3.705334View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
560 m away

Plaza Mayor

Plaza Mayor
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.