100 kW• Fast24/7Active in MITECO registry

Alcobendas - C.de la Constitución

De La Constitucion,58, Alcobendas (28100), Madrid, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity3 bays (3 plugs)
GPS Coordinates40.54337, -3.63797
Official IDCKVAJWH9Z9GWWNY41ERC
Official Registry DateOct 31, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alcobendas, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeCKVAJWH9Z9GWWNY41ERC
Post / EVSE Identifier #13DNSVJSFBDYSF5RHZTYVVQUWUDK
Post / EVSE Identifier #2ES*FCT*E229731
Post / EVSE Identifier #3241840
Post / EVSE Identifier #47E01QXUHIMIQIZRNMGXZWEPWX78
Post / EVSE Identifier #5ES*FCT*E229732
Post / EVSE Identifier #6241841
Post / EVSE Identifier #7DTWF5M9XRYVQQITOAOXJCL1O0VQ
Post / EVSE Identifier #8ES*FCT*E229733
Post / EVSE Identifier #9241842

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.54337 | Lon: -3.637969View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.