EV Charging Stations in Alcobendas (Madrid)
As of 24/10/2026, the municipality of Alcobendas (Madrid) has a total of 61 active public charging stations, with 298 dedicated charging bays and 318 connectors in service. Maximum power output reaches 250 kW, with 118 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Alcobendas
Official consolidated metrics from the public MITECO registry
- Stations
- 61 Physical locations
- Charging Points
- 298 Dedicated bays
- Active Plugs
- 318 Operational outlets
- Fast Charging
- 76 ≥ 43 kW
- Ultra-Fast
- 42 ≥ 150 kW
- Max Power
- 250 kW Peak recorded
Available Connectors in Alcobendas
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 204 plugs |
| CHAdeMO | 10 plugs |
| CCS Combo 2 | 104 plugs |
Power Distribution in Alcobendas
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 42 plugs |
| Fast (43 to 149 kW) | 76 plugs |
| Semi-fast (7.4 to 22 kW) | 182 plugs |
| Standard (< 7.4 kW) | 18 plugs |
EV Charging Stations Map in Alcobendas
61 stations mappedInteractive EV Charging Map
61 charging stations ready to explore
All EV Charging Locations in Alcobendas
Verified specs, connector types and speeds from the official ministry registry
Allego NISSAN CAETANO REICOMSA SL
AhorraMas Alcobendas
ACCIONA - C.C. Moraleja Green
E-M-Algete-001
FAST Río Norte
Alcobendas, Spain
ES_BP_EL SAPO - ALCOBENDAS
Alcobendas - Espacio Miguel Delibes
Estación bp Juncal
NODE. Alcobendas
M-Alcobendas-010
HYC15021BZ1166A
62022014300001
62022014300021
20XM32T8KK3AR00025
CARREFOUR ALCOBENDAS
Acens Technologies
Eurostars Gran Madrid
Eurostars Madrid Congress
Alcobendas Fernando Alonso
Club de Padel La Moraleja - Alcobendas
Alcobendas - Valdelasfuentes estación de tren
Av. España 26 Alcobendas
M-Alcobendas-005
Alcobendas - C.de la Constitución
Calle de la Begonia, 135 - Alcobendas
Avda. Transición Española - Alcobendas
Indra Arroyo
Indra Vega 5
Alcobendas - Centro Cultural Pablo Iglesias
Alcobendas - Calle de Anabel Segura
Alcobendas - Av.de España
La Moraleja Club de Pádel
Alcobendas - Calle de los Aragoneses 1
Alcobendas - Plaza del Pueblo
Avda. de Europa, 7 - Alcobendas
NODE. Carabanchel
Alcobendas - Calle de los Reyes Catolicos
Alcobendas - Avda. de Europa 21
Alcobendas - C.C La Vega
Avenida Bruselas (C.C. Anbel Segura) - Alcobendas
CC El Encinar - Alcobendas
Alcobendas - Calle de la Granja
Alcobendas - Parque de Educación Vial de Alcobendas
REE, Redeia La Moraleja, Parking
Alcobendas - Calle Calabozos
Alcobendas - P.º de la Chopera
Alcobendas - Avda. Doctor Severo Ochoa
Alcobendas - Plaza de la Moraleja
Alcobendas - C. de la Constitución, 106
Repsol, ITP Alcobendas, Parking
Repsol ES, CRED Ongi Etorri
Mercadona, Carr. de Fuencarral, Madrid
Repsol ES, CRED Ctra. Fuencarral
Repsol ES, CRED Alcobendas
CC Plaza Moraleja
Alcobendas - Plaza de Pablo Picasso
Frequently Asked Questions in Alcobendas
How many public EV charging points are there in Alcobendas?
Alcobendas currently has 61 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 318 operational charging plugs.
Are fast charging stations available in Alcobendas?
Yes, Alcobendas features 118 fast and ultra-fast charging plugs (≥43 kW up to 250 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Alcobendas?
Public charging infrastructure in Alcobendas is mainly operated by CHARGING TOGETHER SL, REPSOL SOLUCIONES ENERGÉTICAS SA, Wenea Services Spain, S.L., among other regional networks.
Closest Neighboring Towns to Alcobendas with EV Chargers
Physical proximity calculated via GPS Haversine distance from Alcobendas
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.