22 kW• Semi-fast24/7Active in MITECO registry

AhorraMas Paseo de las Artes

P.º De Las Artes, Pinto 19, Pinto (28320), Madrid, Spain
Network OperatorEDP CLIENTES SAU
Total Capacity4 bays (4 plugs)
GPS Coordinates40.25824, -3.69406
Official ID2023002364
Official Registry DateAug 31, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Pinto, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the EDP CLIENTES SAU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002364
Post / EVSE Identifier #1COD20230000011795PR00000811
Post / EVSE Identifier #2ES*EDP*E00598
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000011796PR00000812
Post / EVSE Identifier #5ES*EDP*E00599
Post / EVSE Identifier #6COD20230000011797PR00000813
Post / EVSE Identifier #7ES*EDP*E00600
Post / EVSE Identifier #8COD20230000011798PR00000814
Post / EVSE Identifier #9ES*EDP*E00601

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Accessibility: SI. Additional amenities: SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.258238 | Lon: -3.694057View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
8.5 km away

M-Leganes-013

Severo Ochoa,15
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
12 points • 12 plugs
Details
50 kW(Fast)
8.8 km away

M-MADRID-012

Valle De Tobalina,24
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
22 kW(Semi-fast)
9.4 km away

M-Leganes-009

Maestro,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.