50 kW• Fast24/7Active in MITECO registry

61944050300001

A-23, Salida, 81, 44460 Sarrión, Teruel,, Sarrión (44460), Teruel, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates40.14913, -0.82436
Official ID2024005127
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sarrión, belonging to the province of Teruel (Aragón, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024005127
Post / EVSE Identifier #1COD20240000041150PR00013323
Post / EVSE Identifier #2ES*ESX*E619440503000011
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000041151PR00013324
Post / EVSE Identifier #5ES*ESX*E619440503000012
Post / EVSE Identifier #62
Post / EVSE Identifier #7COD20240000041152PR00013325
Post / EVSE Identifier #8ES*ESX*E619440503000013
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Sabado (00:00 - 00:00) Martes (00:00 - 00:00) Lunes (00:00 - 00:00) Miercoles (00:00 - 00:00) Jueves (00:00 - 00:00) Viernes (00:00 - 00:00) Domingo (00:00 - 00:00)

Supported Payment Methods

📅Advance slot reservation supported
💳RFID Card / Keyfob reader
🔓Remote plug unlock supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.149129 | Lon: -0.824358View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)⛽Estación Repsol
90 m away

Repsol ES, PEIRO BONAFONTE

N-234, Km. 83, I
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
150 kW(Ultra-fast)🏨Hotel / Alojamiento
8.2 km away

Hotel Rest. Los Maños

Autovía A-23, Km 72.4
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
7 points • 7 plugs
Details
50 kW(Fast)🏨Hotel / Alojamiento
11.9 km away

ACCIONA - Hotel Mora

Urbanización Espinoso, 39
Operator:ACCIONA Recarga
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.