50 kW• Fast🏨Hotel / Alojamiento24/7Active in MITECO registry

ACCIONA - Hotel Mora

Urbanización Espinoso, 39, Mora de Rubielos (44400), Teruel, Spain
Network OperatorACCIONA Recarga
Total Capacity2 bays (3 plugs)
GPS Coordinates40.24647, -0.76480
Official ID2024004380
Official Registry DateJun 21, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Mora de Rubielos, belonging to the province of Teruel (Aragón, Spain). The charging equipment and commercial operation belong to the ACCIONA Recarga network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:380 V
Amperage:16 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004380
Post / EVSE Identifier #1COD20240000036356PR00011491
Post / EVSE Identifier #2ES*ARE*EY9LVKRDAA41GJHT4
Post / EVSE Identifier #35b9247e28636fa39f4adb810
Post / EVSE Identifier #45b9247e28636fa39f4adb80e
Post / EVSE Identifier #5COD20240000036357PR00011492
Post / EVSE Identifier #6ES*ARE*E41CVNKDX1AT3J3DV
Post / EVSE Identifier #75b9247e28636fa39f4adb80d

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Martes (00:00 - 23:59) Domingo (00:00 - 23:59) Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN

Accessibility & Amenities

Standard public access. Additional amenities: RESTAURANTE, CAFETERÍA, HOTEL

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.2464719 | Lon: -0.7647954View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)⛽Estación Repsol
11.1 km away

Repsol ES, IGUAL BUSTAMANTE

Cr, Te - 200, 16, 4 D
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
22 kW(Semi-fast)
11.2 km away

23XP22T3QQJAN00159

Pl. Hispano América, 1, 44415 Rubielos De
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
11.4 km away

20XP22T3KK4AL01147

Pmbde - Pl. Hispano América, 1, 44415
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.