50 kW• Fast24/7Active in MITECO registry

61934038200016

Las Aves Parque Empresarial - C/ Águilas 16, Pinto (28320), Madrid, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates40.24641, -3.71059
Official ID2023003629
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Pinto, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
21.06 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023003629
Post / EVSE Identifier #1COD20230000013123PR00003397
Post / EVSE Identifier #2ES*ESX*E619340382000161
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000013124PR00003398
Post / EVSE Identifier #5ES*ESX*E619340382000162
Post / EVSE Identifier #62
Post / EVSE Identifier #7COD20230000013125PR00003399
Post / EVSE Identifier #8ES*ESX*E619340382000163
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Sabado (00:00 - 23:59) Martes (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
🔓Remote plug unlock supported
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.246406 | Lon: -3.71059View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
9.0 km away

M-Leganes-013

Severo Ochoa,15
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
12 points • 12 plugs
Details
22 kW(Semi-fast)
9.8 km away

M-Leganes-009

Maestro,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
50 kW(Fast)
10.0 km away

M-MADRID-012

Valle De Tobalina,24
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.