EV Charging Stations in Golmayo (Soria)
As of 24/10/2026, the municipality of Golmayo (Soria) has a total of 3 active public charging stations, with 34 dedicated charging bays and 36 connectors in service. Maximum power output reaches 240 kW, with 16 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Golmayo
Official consolidated metrics from the public MITECO registry
- Stations
- 3 Physical locations
- Charging Points
- 34 Dedicated bays
- Active Plugs
- 36 Operational outlets
- Fast Charging
- 7 ≥ 43 kW
- Ultra-Fast
- 9 ≥ 150 kW
- Max Power
- 240 kW Peak recorded
Available Connectors in Golmayo
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 22 plugs |
| CHAdeMO | 3 plugs |
| CCS Combo 2 | 11 plugs |
Power Distribution in Golmayo
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 9 plugs |
| Fast (43 to 149 kW) | 7 plugs |
| Semi-fast (7.4 to 22 kW) | 20 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Golmayo
3 stations mappedInteractive EV Charging Map
3 charging stations ready to explore
All EV Charging Locations in Golmayo
Verified specs, connector types and speeds from the official ministry registry
SO-SORIA-004
Centro Comercial Camaretas
Frequently Asked Questions in Golmayo
How many public EV charging points are there in Golmayo?
Golmayo currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 36 operational charging plugs.
Are fast charging stations available in Golmayo?
Yes, Golmayo features 16 fast and ultra-fast charging plugs (≥43 kW up to 240 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Golmayo?
Public charging infrastructure in Golmayo is mainly operated by IBERDROLA CLIENTES S.A.U, Punto Recargas SL, among other regional networks.
Closest Neighboring Towns to Golmayo with EV Chargers
Physical proximity calculated via GPS Haversine distance from Golmayo
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.