EV Charging Stations in Frómista (Palencia)
As of 24/10/2026, the municipality of Frómista (Palencia) has a total of 3 active public charging stations, with 6 dedicated charging bays and 10 connectors in service. Maximum power output reaches 50 kW, with 6 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Frómista
Official consolidated metrics from the public MITECO registry
- Stations
- 3 Physical locations
- Charging Points
- 6 Dedicated bays
- Active Plugs
- 10 Operational outlets
- Fast Charging
- 6 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 50 kW Peak recorded
Available Connectors in Frómista
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 6 plugs |
| CCS Combo 2 | 2 plugs |
| CHAdeMO | 2 plugs |
Power Distribution in Frómista
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 6 plugs |
| Semi-fast (7.4 to 22 kW) | 2 plugs |
| Standard (< 7.4 kW) | 2 plugs |
EV Charging Stations Map in Frómista
3 stations mappedInteractive EV Charging Map
3 charging stations ready to explore
All EV Charging Locations in Frómista
Verified specs, connector types and speeds from the official ministry registry
Repsol ES, Luykar
Frequently Asked Questions in Frómista
How many public EV charging points are there in Frómista?
Frómista currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 10 operational charging plugs.
Are fast charging stations available in Frómista?
Yes, Frómista features 6 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Frómista?
Public charging infrastructure in Frómista is mainly operated by IBERDROLA CLIENTES S.A.U, REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.
Closest Neighboring Towns to Frómista with EV Chargers
Physical proximity calculated via GPS Haversine distance from Frómista
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.