EV Charging Stations in Dueñas (Palencia)
As of 24/10/2026, the municipality of Dueñas (Palencia) has a total of 3 active public charging stations, with 7 dedicated charging bays and 11 connectors in service. Maximum power output reaches 360 kW, with 11 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Dueñas
Official consolidated metrics from the public MITECO registry
- Stations
- 3 Physical locations
- Charging Points
- 7 Dedicated bays
- Active Plugs
- 11 Operational outlets
- Fast Charging
- 7 ≥ 43 kW
- Ultra-Fast
- 4 ≥ 150 kW
- Max Power
- 360 kW Peak recorded
Available Connectors in Dueñas
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 9 plugs |
| Tipo 2 (Mennekes) | 1 plug |
| CHAdeMO | 1 plug |
Power Distribution in Dueñas
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 4 plugs |
| Fast (43 to 149 kW) | 7 plugs |
| Semi-fast (7.4 to 22 kW) | 0 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Dueñas
3 stations mappedInteractive EV Charging Map
3 charging stations ready to explore
All EV Charging Locations in Dueñas
Verified specs, connector types and speeds from the official ministry registry
Repsol ES, Aljobar S.L 1
Frequently Asked Questions in Dueñas
How many public EV charging points are there in Dueñas?
Dueñas currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 11 operational charging plugs.
Are fast charging stations available in Dueñas?
Yes, Dueñas features 11 fast and ultra-fast charging plugs (≥43 kW up to 360 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Dueñas?
Public charging infrastructure in Dueñas is mainly operated by (ZUNDER) Grupo Easychargar SA, Atlante Iberia SL, REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.
Closest Neighboring Towns to Dueñas with EV Chargers
Physical proximity calculated via GPS Haversine distance from Dueñas
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.