EV Charging Stations in Torrejón de Ardoz (Madrid)

How many EV charging points are there in Torrejón de Ardoz?

As of 24/10/2026, the municipality of Torrejón de Ardoz (Madrid) has a total of 30 active public charging stations, with 87 dedicated charging bays and 106 connectors in service. Maximum power output reaches 360 kW, with 35 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Torrejón de Ardoz

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
30
Physical locations
Charging Points
87
Dedicated bays
Active Plugs
106
Operational outlets
Fast Charging
9
≥ 43 kW
Ultra-Fast
26
≥ 150 kW
Max Power
360 kW
Peak recorded

Available Connectors in Torrejón de Ardoz

Charging connectors by type in Torrejón de Ardoz
Connector TypeActive Plugs
Tipo 2 (Mennekes)71 plugs
CEE Cetac Rojo 32A1 plug
CCS Combo 232 plugs
CHAdeMO2 plugs

Power Distribution in Torrejón de Ardoz

Charging plugs distribution by power in Torrejón de Ardoz
Power RatingPlugs
Ultra-fast (≥ 150 kW)26 plugs
Fast (43 to 149 kW)9 plugs
Semi-fast (7.4 to 22 kW)71 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Torrejón de Ardoz

30 stations mapped

Interactive EV Charging Map

30 charging stations ready to explore

All EV Charging Locations in Torrejón de Ardoz

Verified specs, connector types and speeds from the official ministry registry

22 kW(Semi-fast)24/7

AhorraMas Grecia

C. Grecia 3
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
60 kW(Fast)✓ Cable24/7

US_175_Torrejón_II

Avenida De La Constitución 249
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
50 kW(Fast)✓ Cable24/7

M-TORREJONDEARDOZ-001

Constitucion,108
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 6 plugs
Details
22 kW(Semi-fast)🏬Centro Comercial24/7

20XP22T3KK4AL00864

Parque Comercial On Plaza (C&W) - Av. De La
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)🏬Centro Comercial24/7

20XP22T3KK4AL00865

Parque Comercial On Plaza (C&W) - Av. De La
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)🏬Centro Comercial24/7

20XP22T3KK4AL00855

Parque Comercial On Plaza (C&W) -Av. De La
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)🏬Centro Comercial24/7

20XP22T3KK4AL00857

Parque Comercial On Plaza (C&W) - Av. De La
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
150 kW(Ultra-fast)✓ Cable24/7

C6E15BCC22AYKMGJGY

Av. Claudio Coello, 28850 Torrejón De Ardoz,
Operator:ENDESA X WAY, S.L.
CCS Combo 2
2 points • 2 plugs
Details
11 kW(Semi-fast)24/7

22XP22T3KKJAK00260

Av. Claudio Coello, 28850 Torrejón De Ardoz,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
60 kW(Fast)✓ Cable24/7

Nasas Torrejon

C. Hierro, 40
Operator:Atlante Iberia SL
CCS Combo 2
2 points • 4 plugs
Details
360 kW(Ultra-fast)✓ Cable24/7

WS Torrejón de Ardoz

Av. De La Constitución, 235
Operator:Wenea Services Spain, S.L.
CCS Combo 2
22 points • 22 plugs
Details
22 kW(Semi-fast)✓ Cable24/7

Indra Torrejón

Carretera De Loeches, 9
Operator:Wenea Services Spain, S.L.
Tipo 2 (Mennekes)
12 points • 12 plugs
Details

Frequently Asked Questions in Torrejón de Ardoz

How many public EV charging points are there in Torrejón de Ardoz?

Torrejón de Ardoz currently has 30 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 106 operational charging plugs.

Are fast charging stations available in Torrejón de Ardoz?

Yes, Torrejón de Ardoz features 35 fast and ultra-fast charging plugs (≥43 kW up to 360 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Torrejón de Ardoz?

Public charging infrastructure in Torrejón de Ardoz is mainly operated by FERROVIAL CONSTRUCCIÓN S.A., ENDESA X WAY, S.L., EDP CLIENTES SAU, among other regional networks.

Closest Neighboring Towns to Torrejón de Ardoz with EV Chargers

Physical proximity calculated via GPS Haversine distance from Torrejón de Ardoz

All towns in Madrid
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.