EV Charging Stations in Mejorada del Campo (Madrid)
As of 24/10/2026, the municipality of Mejorada del Campo (Madrid) has a total of 4 active public charging stations, with 11 dedicated charging bays and 14 connectors in service. Maximum power output reaches 100 kW, with 8 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Mejorada del Campo
Official consolidated metrics from the public MITECO registry
- Stations
- 4 Physical locations
- Charging Points
- 11 Dedicated bays
- Active Plugs
- 14 Operational outlets
- Fast Charging
- 8 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 100 kW Peak recorded
Available Connectors in Mejorada del Campo
| Connector Type | Active Plugs |
|---|---|
| CHAdeMO | 2 plugs |
| CCS Combo 2 | 5 plugs |
| Tipo 2 (Mennekes) | 7 plugs |
Power Distribution in Mejorada del Campo
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 8 plugs |
| Semi-fast (7.4 to 22 kW) | 6 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Mejorada del Campo
4 stations mappedInteractive EV Charging Map
4 charging stations ready to explore
All EV Charging Locations in Mejorada del Campo
Verified specs, connector types and speeds from the official ministry registry
Mercadona, Esla, Madrid
Repsol ES, CRED Mejorada del Campo
E.S. BENOL 2, SL
Frequently Asked Questions in Mejorada del Campo
How many public EV charging points are there in Mejorada del Campo?
Mejorada del Campo currently has 4 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 14 operational charging plugs.
Are fast charging stations available in Mejorada del Campo?
Yes, Mejorada del Campo features 8 fast and ultra-fast charging plugs (≥43 kW up to 100 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Mejorada del Campo?
Public charging infrastructure in Mejorada del Campo is mainly operated by REPSOL SOLUCIONES ENERGÉTICAS SA, IBERDROLA CLIENTES S.A.U, among other regional networks.
Closest Neighboring Towns to Mejorada del Campo with EV Chargers
Physical proximity calculated via GPS Haversine distance from Mejorada del Campo
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.