EV Charging Stations in Quer (Guadalajara)

How many EV charging points are there in Quer?

As of 24/10/2026, the municipality of Quer (Guadalajara) has a total of 1 active public charging stations, with 3 dedicated charging bays and 3 connectors in service. Maximum power output reaches 50 kW, with 3 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Quer

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
1
Physical locations
Charging Points
3
Dedicated bays
Active Plugs
3
Operational outlets
Fast Charging
3
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
50 kW
Peak recorded

Available Connectors in Quer

Charging connectors by type in Quer
Connector TypeActive Plugs
CHAdeMO1 plug
CCS Combo 21 plug
Tipo 2 (Mennekes)1 plug
Operators in Quer:

Power Distribution in Quer

Charging plugs distribution by power in Quer
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)3 plugs
Semi-fast (7.4 to 22 kW)0 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Quer

1 stations mapped

Interactive EV Charging Map

1 charging stations ready to explore

All EV Charging Locations in Quer

Verified specs, connector types and speeds from the official ministry registry

50 kW(Fast)✓ Cable24/7

20XM32T8KK4AR00070

Emu - C. Vega Del Henares, 15, 19209 Quer,
Operator:ENDESA X WAY, S.L.
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
3 points • 3 plugs
Details

Frequently Asked Questions in Quer

How many public EV charging points are there in Quer?

Quer currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 3 operational charging plugs.

Are fast charging stations available in Quer?

Yes, Quer features 3 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Quer?

Public charging infrastructure in Quer is mainly operated by ENDESA X WAY, S.L., among other regional networks.

Closest Neighboring Towns to Quer with EV Chargers

Physical proximity calculated via GPS Haversine distance from Quer

All towns in Guadalajara
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.