EV Charging Stations in Granja de Rocamora (Alicante/Alacant)
As of 24/10/2026, the municipality of Granja de Rocamora (Alicante/Alacant) has a total of 3 active public charging stations, with 6 dedicated charging bays and 8 connectors in service. Maximum power output reaches 60 kW, with 6 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Granja de Rocamora
Official consolidated metrics from the public MITECO registry
- Stations
- 3 Physical locations
- Charging Points
- 6 Dedicated bays
- Active Plugs
- 8 Operational outlets
- Fast Charging
- 6 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 60 kW Peak recorded
Available Connectors in Granja de Rocamora
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 4 plugs |
| CHAdeMO | 2 plugs |
| Tipo 2 (Mennekes) | 2 plugs |
Power Distribution in Granja de Rocamora
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 6 plugs |
| Semi-fast (7.4 to 22 kW) | 2 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Granja de Rocamora
3 stations mappedInteractive EV Charging Map
3 charging stations ready to explore
All EV Charging Locations in Granja de Rocamora
Verified specs, connector types and speeds from the official ministry registry
A-GranjaRocamora-002
Frequently Asked Questions in Granja de Rocamora
How many public EV charging points are there in Granja de Rocamora?
Granja de Rocamora currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 8 operational charging plugs.
Are fast charging stations available in Granja de Rocamora?
Yes, Granja de Rocamora features 6 fast and ultra-fast charging plugs (≥43 kW up to 60 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Granja de Rocamora?
Public charging infrastructure in Granja de Rocamora is mainly operated by IBERDROLA CLIENTES S.A.U, ENDESA X WAY, S.L., among other regional networks.
Closest Neighboring Towns to Granja de Rocamora with EV Chargers
Physical proximity calculated via GPS Haversine distance from Granja de Rocamora
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.