EV Charging Stations in Cox (Alicante/Alacant)
As of 24/10/2026, the municipality of Cox (Alicante/Alacant) has a total of 3 active public charging stations, with 5 dedicated charging bays and 7 connectors in service. Maximum power output reaches 60 kW, with 5 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Cox
Official consolidated metrics from the public MITECO registry
- Stations
- 3 Physical locations
- Charging Points
- 5 Dedicated bays
- Active Plugs
- 7 Operational outlets
- Fast Charging
- 5 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 60 kW Peak recorded
Available Connectors in Cox
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 3 plugs |
| CCS Combo 2 | 3 plugs |
| CHAdeMO | 1 plug |
Power Distribution in Cox
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 5 plugs |
| Semi-fast (7.4 to 22 kW) | 2 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Cox
3 stations mappedInteractive EV Charging Map
3 charging stations ready to explore
All EV Charging Locations in Cox
Verified specs, connector types and speeds from the official ministry registry
Repsol ES, FOOTWEAR COX
Frequently Asked Questions in Cox
How many public EV charging points are there in Cox?
Cox currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 7 operational charging plugs.
Are fast charging stations available in Cox?
Yes, Cox features 5 fast and ultra-fast charging plugs (≥43 kW up to 60 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Cox?
Public charging infrastructure in Cox is mainly operated by IBERDROLA CLIENTES S.A.U, REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.
Closest Neighboring Towns to Cox with EV Chargers
Physical proximity calculated via GPS Haversine distance from Cox
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.