96 kW• Fast24/7Active in MITECO registry

Via Augusta - C. Comercial

Via Augusta,21, Sant Cugat del Vallès (08174), Barcelona, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (6 plugs)
GPS Coordinates41.48279, 2.05138
Official IDGIIJLBCGUFI3DXRXS4AJ
Official Registry DateJun 09, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sant Cugat del Vallès, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Schuko (Enchufe doméstico)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:16 A
Tipo 2 (Mennekes)
14.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
2 connectors available
Schuko (Enchufe doméstico)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:16 A
Tipo 2 (Mennekes)
14.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
CCS Combo 2
⚡ 800V96 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
4Charging Bay #4
1 connector available
CCS Combo 2
⚡ 800V96 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeGIIJLBCGUFI3DXRXS4AJ
Post / EVSE Identifier #1P70SA2PVPDMCSJ4AMAJELTJAHNO
Post / EVSE Identifier #2ES*IBD*E262292
Post / EVSE Identifier #3275463
Post / EVSE Identifier #4275462
Post / EVSE Identifier #5YONMPG97O6QKDCOAN3DU1FONF0U
Post / EVSE Identifier #6ES*IBD*E262293
Post / EVSE Identifier #7275465
Post / EVSE Identifier #8275464
Post / EVSE Identifier #9NA1Q6XI18TI39MRTQYFCFRABH5V
Post / EVSE Identifier #10ES*IBD*E262275
Post / EVSE Identifier #11275445
Post / EVSE Identifier #12NLEL4M78URIR5F9YUXLWGJBGN4U
Post / EVSE Identifier #13ES*IBD*E262276
Post / EVSE Identifier #14275446

Theoretical Charging Times at Maximum Power (96 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~13 min(~0.2 hours)
40 kWh Battery~25 min(~0.4 hours)
60 kWh Battery~38 min(~0.6 hours)
80 kWh Battery~50 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.482789 | Lon: 2.051377View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.