22 kW• Semi-fast24/7Active in MITECO registry

VALDASTILLAS

C/ Piscina Nº 1, Valdastillas (10614), Cáceres, Spain
Network OperatorOESTE SOLUCIONES ENERGETICAS, S.L.
Total Capacity1 bay (2 plugs)
GPS Coordinates40.13358, -5.87908
Official ID2024001979
Official Registry DateMar 08, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Valdastillas, belonging to the province of Cáceres (Extremadura, Spain). The charging equipment and commercial operation belong to the OESTE SOLUCIONES ENERGETICAS, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001979
Post / EVSE Identifier #1COD20240000024972PR00005014
Post / EVSE Identifier #2ES*OSE*E11864
Post / EVSE Identifier #32
Post / EVSE Identifier #41

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.133582 | Lon: -5.879075View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
3.2 km away

PIORNAL

Avenida De La Vera, 1
Operator:OESTE SOLUCIONES ENERGETICAS, S.L.
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
22 kW(Semi-fast)
5.4 km away

EL TORNO

C. De Las Flores, 29
Operator:OESTE SOLUCIONES ENERGETICAS, S.L.
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.