7.4 kW• Semi-fast24/7Active in MITECO registry

V-ELIANA-008

Tuejar,37, Eliana, l' (46183), Valencia/València, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates39.57919, -0.53160
Official ID2024000442
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Eliana, l', belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000442
Post / EVSE Identifier #1COD20240000018586PR00001301
Post / EVSE Identifier #2ES*IBD*E222924
Post / EVSE Identifier #3234912
Post / EVSE Identifier #4COD20240000018587PR00001302
Post / EVSE Identifier #5ES*IBD*E222925
Post / EVSE Identifier #6234913
Post / EVSE Identifier #7COD20240000018588PR00001303
Post / EVSE Identifier #8ES*IBD*E222926
Post / EVSE Identifier #9234914
Post / EVSE Identifier #10COD20240000018589PR00001304
Post / EVSE Identifier #11ES*IBD*E222927
Post / EVSE Identifier #12234915

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access. Additional amenities: CENTRO COMERCIAL

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.579188 | Lon: -0.531599View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.