60 kW• Fast24/7Active in MITECO registry

US_82_Burlada I

Polígono Mugazuri, 3-B, Burlada/Burlata (31600), Navarra, Spain
Network OperatorPLENOIL, S.L.
Total Capacity1 bay (1 plug)
GPS Coordinates42.83123, -1.62019
Official ID5CZZPO9W81A75WJSOMLN
Official Registry DateAug 25, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Burlada/Burlata, belonging to the province of Navarra (Navarra, Comunidad Foral de, Spain). The charging equipment and commercial operation belong to the PLENOIL, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:420 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code5CZZPO9W81A75WJSOMLN
Post / EVSE Identifier #1AC70UV9GBAPNQ09XOBLV3DZWJIH
Post / EVSE Identifier #2ES*PLE*E601R0RDDFLC2408A007A0
Post / EVSE Identifier #31

Theoretical Charging Times at Maximum Power (60 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~20 min(~0.3 hours)
40 kWh Battery~40 min(~0.7 hours)
60 kWh Battery~1 h(~1 hours)
80 kWh Battery~1 h 20 min(~1.3 hours)

Opening Hours

Lunes (00:00 - 00:00) Martes (00:00 - 00:00) Jueves (00:00 - 00:00) Miercoles (00:00 - 00:00) Domingo (00:00 - 00:00) Viernes (00:00 - 00:00) Sabado (00:00 - 00:00)

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.83123 | Lon: -1.62019View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
3.4 km away

NA-Pamplona-014

San Roque,4
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.