60 kW• Fast24/7Active in MITECO registry

US_464_O Porriño II

Domingo Bueno, 96, Mos (36418), Pontevedra, Spain
Network OperatorPLENOIL, S.L.
Total Capacity1 bay (1 plug)
GPS Coordinates42.15572, -8.62000
Official IDMGXYM3KBBCVOYP6A9OWU
Official Registry DateAug 25, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Mos, belonging to the province of Pontevedra (Galicia, Spain). The charging equipment and commercial operation belong to the PLENOIL, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:420 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeMGXYM3KBBCVOYP6A9OWU
Post / EVSE Identifier #13JIFIXJ2Q9BQFCCL1THNJPDJHGC
Post / EVSE Identifier #2ES*PLE*E601R0RDAPHC2411A004A0
Post / EVSE Identifier #31

Theoretical Charging Times at Maximum Power (60 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~20 min(~0.3 hours)
40 kWh Battery~40 min(~0.7 hours)
60 kWh Battery~1 h(~1 hours)
80 kWh Battery~1 h 20 min(~1.3 hours)

Opening Hours

Miercoles (00:00 - 00:00) Domingo (00:00 - 00:00) Martes (00:00 - 00:00) Lunes (00:00 - 00:00) Sabado (00:00 - 00:00) Jueves (00:00 - 00:00) Viernes (00:00 - 00:00)

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.15572 | Lon: -8.62View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
1.3 km away

SYNGENTA

Lugar a Relva
Operator:ENERGEA CONSULTING Y ASESORES SL
Tipo 2 (Mennekes)
2 points • 4 plugs
Details
350 kW(Ultra-fast)
1.5 km away

PO-Mos-001

Sanquiñeda Monte,118
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.