60 kW• Fast24/7Active in MITECO registry

US_199_Lora del Rio I

Ronda De Los Tejares, 249, Alcolea del Río (41440), Sevilla, Spain
Network OperatorPLENOIL, S.L.
Total Capacity1 bay (1 plug)
GPS Coordinates37.65236, -5.52254
Official ID2SLMAFYE7CJVG7LOA1WL
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alcolea del Río, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the PLENOIL, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:420 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2SLMAFYE7CJVG7LOA1WL
Post / EVSE Identifier #1VJSNHLSN4UOAMJSHPEOD1SRKAOP
Post / EVSE Identifier #2ES*PLE*E601R0RDDPHC2437A004A0
Post / EVSE Identifier #31

Theoretical Charging Times at Maximum Power (60 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~20 min(~0.3 hours)
40 kWh Battery~40 min(~0.7 hours)
60 kWh Battery~1 h(~1 hours)
80 kWh Battery~1 h 20 min(~1.3 hours)

Opening Hours

Miercoles (00:00 - 00:00) Martes (00:00 - 00:00) Sabado (00:00 - 00:00) Lunes (00:00 - 00:00) Viernes (00:00 - 00:00) Jueves (00:00 - 00:00) Domingo (00:00 - 00:00)

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.6523624 | Lon: -5.5225355View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
850 m away

E-SE-LoraDelRio-001

Marcos Orbaneja,33
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
20.8 km away

22XP22T3KKJAK00253

Km. 500, A-4, 41410 Sevilla, Spain
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
20.9 km away

22XP22T3KK4AK00046

Km. 500, A-4, 41410 Sevilla, Spain
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.