120 kW• FastHorario habitualActive in MITECO registry

URBAN PADESPORT ALCOI

Carrer Alacant,68-70, Alcoi/Alcoy (03801), Alicante/Alacant, Spain
Network OperatorREMO SUSTAINABLE MOBILITY S.L
Total Capacity1 bay (2 plugs)
GPS Coordinates38.68686, -0.47652
Official ID2024003590
Official Registry DateMay 30, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alcoi/Alcoy, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the REMO SUSTAINABLE MOBILITY S.L network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
⚡ 800V120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:200 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003590
Post / EVSE Identifier #1COD20240000032628PR00008752
Post / EVSE Identifier #2ES*RSM*E000000000080
Post / EVSE Identifier #31759/1773
Post / EVSE Identifier #45947

Theoretical Charging Times at Maximum Power (120 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~10 min(~0.2 hours)
40 kWh Battery~20 min(~0.3 hours)
60 kWh Battery~30 min(~0.5 hours)
80 kWh Battery~40 min(~0.7 hours)

Opening Hours

Jueves (07:00 - 22:00) Miercoles (07:00 - 22:00) Martes (07:00 - 22:00) Domingo (08:30 - 22:00) Sabado (08:00 - 22:00) Lunes (07:00 - 22:00) Viernes (07:00 - 22:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
✓PERFIL DE CARGA ADMITIDO
✓COMPATIBLE CON TARJETAS CONTACTLESS

Accessibility & Amenities

Accessibility: SI. Additional amenities: INSTALACIÓN DEPORTIVA

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.6868564 | Lon: -0.476521View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
240 m away

ENILEC, SL

C/ Avinguda de d`Elx 29
Operator:FENIE ENERGIA, SA
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
1 point • 2 plugs
Details
60 kW(Fast)
580 m away

US_295_Alcoy

Calle Navacerrada
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
80 kW(Fast)🏬Centro Comercial
1.3 km away

Centro Comercial Alzamora

Carrer Els Alçamora, 44, 03802 Alcoi, Alacan
Operator:Punto Recargas SL
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
22 points • 22 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.