22 kW• Semi-fast24/7Active in MITECO registry

Universidad

Paseo Menéndez Pelayo S/N, Murcia (30001), Murcia, Spain
Network OperatorAPK ELECTRIC, S.L.
Total Capacity6 bays (6 plugs)
GPS Coordinates37.98820, -1.12647
Official IDR6WUYNCAQ4SATA5PG0SC
Official Registry DateJan 28, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Murcia, belonging to the province of Murcia (Murcia, Región de, Spain). The charging equipment and commercial operation belong to the APK ELECTRIC, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeR6WUYNCAQ4SATA5PG0SC
Post / EVSE Identifier #1UEZYAW9HRDJGSNMDFCVFKKLW11G
Post / EVSE Identifier #2ES*APK*E6763234df30bbaf88b0446c6
Post / EVSE Identifier #31
Post / EVSE Identifier #4EPAKYY8IY9R66QLIGDH74BHZUIE
Post / EVSE Identifier #5ES*APK*E67632359d9f175152602067d
Post / EVSE Identifier #69TKH86OQWEVDWTPB7YHZ9NHK4YH
Post / EVSE Identifier #7ES*APK*E6763236566247ac0a10eb6a8
Post / EVSE Identifier #82PDQ9DG6RLWRAAL4FIQSVUCF7C0
Post / EVSE Identifier #9ES*APK*E6763237066247ac0a10eb6aa
Post / EVSE Identifier #10PLAA0JTFN9XP1ORIIT7CXW7H13D
Post / EVSE Identifier #11ES*APK*E6763237c402ab5272b0c7ec2
Post / EVSE Identifier #12ODVXB2NVMBGFUD8RZFFMSABPNLR
Post / EVSE Identifier #13ES*APK*E67632389f30bbaf88b0446ca

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.988198 | Lon: -1.126467View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
730 m away

MU-MURCIA-022

Rio Segura,6
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
50 kW(Fast)
1.4 km away

MU-Murcia-019

Pinos,7
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
4 points • 6 plugs
Details
50 kW(Fast)
1.5 km away

MU-Murcia-046

Pergola,1
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.