7.36 kW• Standard🅿️Parking24/7Active in MITECO registry

Universidad de Comillas, Parking

Universidad De Comillas, 5, Madrid (28049), Madrid, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity8 bays (8 plugs)
GPS Coordinates40.55047, -3.68141
Official IDLK2TLEZJZD6LRJQYVATB
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeLK2TLEZJZD6LRJQYVATB
Post / EVSE Identifier #1Y7QIDYNXUQJZVKLGDOMSSGR34OZ
Post / EVSE Identifier #2ES*REP*E10267*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4P1X7VW76FESCEQDE3VW4K2HFJOT
Post / EVSE Identifier #5ES*REP*E10267*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7FWRJDPBDWOTZ6C4LNTPTYENDPXO
Post / EVSE Identifier #8ES*REP*E10268*1
Post / EVSE Identifier #9MUVXGEO0Y98SQ4IZJLJC6DUFERC
Post / EVSE Identifier #10ES*REP*E10268*2
Post / EVSE Identifier #11XIE3REA66PVVQOABISK9ZUQLIPA
Post / EVSE Identifier #12ES*REP*E10269*1
Post / EVSE Identifier #13LXEBCLZINWLOCG0PPXPVGMXMLKL
Post / EVSE Identifier #14ES*REP*E10269*2
Post / EVSE Identifier #15HENCAK4DBGRUWRMBU66IKO0DQZX
Post / EVSE Identifier #16ES*REP*E10270*1
Post / EVSE Identifier #17HTT7HSJWQIXR95OAMYIOMSGRBQ7
Post / EVSE Identifier #18ES*REP*E10270*2

Theoretical Charging Times at Maximum Power (7.36 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 43 min(~2.7 hours)
40 kWh Battery~5 h 26 min(~5.4 hours)
60 kWh Battery~8 h 9 min(~8.2 hours)
80 kWh Battery~10 h 52 min(~10.9 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.550467 | Lon: -3.681413View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.