7 kW• Standard24/7Active in MITECO registry

Travessera 53

Travessera De Gràcia 53, Barcelona (08006), Barcelona, Spain
Network OperatorAPK ELECTRIC, S.L.
Total Capacity4 bays (4 plugs)
GPS Coordinates41.39629, 2.14973
Official IDLU0TAZGQTIE3UFVOETMJ
Official Registry DateJan 28, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Barcelona, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the APK ELECTRIC, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeLU0TAZGQTIE3UFVOETMJ
Post / EVSE Identifier #1XALX3SSKFMIQNWFNN6DBKXFISOM
Post / EVSE Identifier #2ES*APK*E684ffccf457af408260d96fb
Post / EVSE Identifier #31
Post / EVSE Identifier #4YALT2ALNUN2BZS4I77EDEZA8Y25
Post / EVSE Identifier #5ES*APK*E684ffce7457af408260d9705
Post / EVSE Identifier #6AH9G6II7492E2WFQEZ6UV9ZELB4
Post / EVSE Identifier #7ES*APK*E684ffcf5189ce028c8087c2a
Post / EVSE Identifier #84KWQP2ZXIFQUJT4RWZZD0RLT4TP
Post / EVSE Identifier #9ES*APK*E684ffd0a457af408260d9717

Theoretical Charging Times at Maximum Power (7 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 51 min(~2.9 hours)
40 kWh Battery~5 h 43 min(~5.7 hours)
60 kWh Battery~8 h 34 min(~8.6 hours)
80 kWh Battery~11 h 26 min(~11.4 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.396289 | Lon: 2.149733View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
4.0 km away

APK2 Plaza del Mar

Passeig De Joan De Borbón 78
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.