200 kW• Ultra-fastActive in MITECO registry

TotalEnergies - Restaurante Los Manzanos

Carretera Madrid - Alicante, Km 280, Chinchilla de Monte-Aragón (02695), Albacete, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates38.90072, -1.51996
Official IDP0J937BIEA27ZNNJKPK3
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Chinchilla de Monte-Aragón, belonging to the province of Albacete (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
200 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:600 V
Amperage:500 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:200 A
3Charging Bay #3
1 connector available
CCS Combo 2
200 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:600 V
Amperage:500 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeP0J937BIEA27ZNNJKPK3
Post / EVSE Identifier #1OSSKPRPPYXNHIGQD6QEYVPX7YQC
Post / EVSE Identifier #2ES*TCB*E000408
Post / EVSE Identifier #31
Post / EVSE Identifier #4IOJWO6SM5Z67VNW52WD9KMFSSZ5
Post / EVSE Identifier #5ES*TCB*E000409
Post / EVSE Identifier #6MCXPMVHWTUGSM2VIH172KXC3UN7
Post / EVSE Identifier #7ES*TCB*E000410
Post / EVSE Identifier #8KSQ2D2JMP2TJNLRYNPSYA8MYXSK
Post / EVSE Identifier #9ES*TCB*E000411

Theoretical Charging Times at Maximum Power (200 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~6 min(~0.1 hours)
40 kWh Battery~12 min(~0.2 hours)
60 kWh Battery~18 min(~0.3 hours)
80 kWh Battery~24 min(~0.4 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.900723 | Lon: -1.519957View on OpenStreetMap →
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.