150 kW• Ultra-fastActive in MITECO registry

TotalEnergies - Rest. Grijota Golf

Ctra. Palencia-Villada, 0, Grijota (34192), Palencia, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity2 bays (2 plugs)
GPS Coordinates42.04819, -4.57740
Official IDIUGVFU37BPFPXMLXJWBF
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Grijota, belonging to the province of Palencia (Castilla y León, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
2Charging Bay #2
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeIUGVFU37BPFPXMLXJWBF
Post / EVSE Identifier #1SMHPIDTQ27PZIMMS9HIKE9LRZGG
Post / EVSE Identifier #2ES*TCB*E001089
Post / EVSE Identifier #31
Post / EVSE Identifier #4GTDAGBFA5CNFUKBGMLQESGYOSFR
Post / EVSE Identifier #5ES*TCB*E001090

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.048187 | Lon: -4.577396View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
5.1 km away

US_282_Palencia

Ctra. De Santander
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
21 kW(Semi-fast)
5.7 km away

22XP22T3KKJAK00266

C. Juan Ramon Jimenez, 3, 34001 Palencia,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.