TotalEnergies - Rest. Europa

Pol. Ind. Sancti-Spiritus, C. Los Tesos, 47D, Sancti-Spíritus (37470), Salamanca, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates40.69635, -6.41737
Official IDKL8O6LQERSDOB335KHWP
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sancti-Spíritus, belonging to the province of Salamanca (Castilla y León, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeKL8O6LQERSDOB335KHWP
Post / EVSE Identifier #1ESHF8I3R9LQOBDM5WVF0QGJAA5I
Post / EVSE Identifier #2ES*TCB*E000926
Post / EVSE Identifier #31
Post / EVSE Identifier #4MCUAZMYJUNGWRTHCDQVTML6YNOC
Post / EVSE Identifier #5ES*TCB*E000927
Post / EVSE Identifier #6QC2JPSA7OESX7JS10DWGNBDQWEC
Post / EVSE Identifier #7ES*TCB*E000928
Post / EVSE Identifier #8NQC7HUC4EJRJCQ9PFJXUP516ZMR
Post / EVSE Identifier #9ES*TCB*E000929

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.69635 | Lon: -6.417365View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)⛽Estación Repsol
3.0 km away

Repsol ES, CRED Sancti Spiritus

Cr Cr A-62 ,P.K. 309 M.I.
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.