TotalEnergies - Rest. Beltran Jenaro

Carrer De Les Flors, 48, Camarles (43894), Tarragona, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates40.76495, 0.64640
Official IDAKXHGZEJPZYRBGUQNFM5
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Camarles, belonging to the province of Tarragona (Cataluña, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeAKXHGZEJPZYRBGUQNFM5
Post / EVSE Identifier #1ITO58ROO2XW8U7XDVPPVOL5VXHT
Post / EVSE Identifier #2ES*TCB*E000979
Post / EVSE Identifier #31
Post / EVSE Identifier #4FY3DLRBJSDKW5ATY5BRDBEGDLZX
Post / EVSE Identifier #5ES*TCB*E000980
Post / EVSE Identifier #6DLUXTDMMGHDKQX0QOFNJDDYE8PR
Post / EVSE Identifier #7ES*TCB*E000981
Post / EVSE Identifier #8EGPTDSDMXX98JHEGB0VYXLQY0KV
Post / EVSE Identifier #9ES*TCB*E000982

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)
✓PAGO CON TARJETA DE CRÉDITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.764946 | Lon: 0.646396View on OpenStreetMap →

Other Nearby Charging Stations

250 kW(Ultra-fast)
3.5 km away

L´Aldea, Spain

Nacional 235, Km 11,5
Operator:Tesla Spain SLU
CCS Combo 2Tipo 2 (Mennekes)
16 points • 24 plugs
Details
180 kW(Ultra-fast)
3.6 km away

Exit - L'Aldea

Ap7-Pol Ind Estacio Mercaderies 0,Pcl,58 Nau
Operator:(ZUNDER) Grupo Easychargar SA
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
10 points • 10 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.